Today, the new Danube Station No. 20 in Dürnstein was put into service
To withstand the current during extreme flooding and prevent log jams caused by drifting trees, a new, taller ship-shaped structure was built and installed today.
With the former BRANDNER universal vessel “Drei Gebrüder” equipped with a cable excavator, this difficult task was carried out by professionals in a very short time.
We are pleased with the new barrier structure.